Precast: Representative Mixed Architectural/Structural Projects Print Email

Salvation Army Kroc Center, Omaha, NE
(Multi-purpose)

University of Nebraska Parking Garage, Omaha, NE
The University of Nebraska Omaha has addressed student parking tribulations on the Dodge Campus by building a five-level parking garage that will replace existing surface lots.  The new garage – adjacent to the new apartment-style housing facility termed Maverick Village – has a capacity for 892 vehicles.  The 290,000 gross square foot project is estimated to cost $11.850 million.  Responding to the campus architecture, the garage incorporates punched openings, inlaid face brick, light and heavy sandblast finish and curved reveals.

There are a total of 540 structural and architectural precast pieces on UNO’s new 3-bay garage.  The floor system is comprised of 308 12-foot wide, 30-inch deep pretopped double tees spanning lengths up to 60 feet.  The tees are supported on the interior by prestressed lite wall shear panels and on the exterior by 10-inch thick prestressed wall panels with an architectural finish.  At the end of each bay, four 24-inch square columns support 42-inch deep inverted tee beams, which span 42 feet.  Two stair towers at each end of the garage consist of 22-foot long precast stair treads and flat slabs.
(Parking Garage)

JC Penny, Overland Park, KS
(Retail)

Salvation Army Community Center, Kansas City, KS
(Multi-purpose)

Turnkey, La Vista, NE
Turnkey Solutions new facility is a 56,760 SF industrial building for office and warehouse space. This software manufacturer produces CD’s, DVD’s, VHS tapes and, audio cassettes, and is the largest duplication facility of its kind in the country.

Lifetime Fitness Center, Omaha, NE
This $22.5 million, 110,000-square-foot health and fitness center located in west Omaha featurew indoor and outdoor amenities including two large swimming pools, several waterslides, a spa and café.

Designers used a total precast concrete system, including 562 precast pieces.  The precast pieces included 285 double tees, 44 structural columns, 39 inverted tee beams, 19 rectangular beams, 3 L-beams, and 172 prestressed wall panels.  The wall panels were typically 39’-11” tall, either 6” or 8” thick and covered in a brick veneer.  Roof double tee’s over the basketball courts spanned as far as 92’-8”.

Central Utility Plant (CUP) Building, Tampa, FL
(Facility – Utility Building)

Metropolitan Utilities District Pump Station, Omaha, NE
Erection and shop drawings for a new 34,500 SF single story pump station.  Components included columns, beams, insulated wall panels and double tee and hollow core roof panels.  Conventional acid etch and light sandblast finish.

University of Kansas Medical Center Parking Facility #3, Lawrence, KS
Erection and shop drawings for a new five level parking structure.  Components included brick faced wall panels and structural double tees for three entry bridges – two pedestrian and one vehicular.

 