| Precast: Representative Mixed Architectural/Structural Projects |
|
|
|
Salvation Army Kroc Center, Omaha, NE
University of Nebraska Parking Garage, Omaha, NE
There are a total of 540 structural and architectural precast pieces on UNO’s new 3-bay garage. The floor system is comprised of 308 12-foot wide, 30-inch deep pretopped double tees spanning lengths up to 60 feet. The tees are supported on the interior by prestressed lite wall shear panels and on the exterior by 10-inch thick prestressed wall panels with an architectural finish. At the end of each bay, four 24-inch square columns support 42-inch deep inverted tee beams, which span 42 feet. Two stair towers at each end of the garage consist of 22-foot long precast stair treads and flat slabs.
JC Penny, Overland Park, KS
Salvation Army Community Center, Kansas City, KS
Turnkey, La Vista, NE
Lifetime Fitness Center, Omaha, NE Designers used a total precast concrete system, including 562 precast pieces. The precast pieces included 285 double tees, 44 structural columns, 39 inverted tee beams, 19 rectangular beams, 3 L-beams, and 172 prestressed wall panels. The wall panels were typically 39’-11” tall, either 6” or 8” thick and covered in a brick veneer. Roof double tee’s over the basketball courts spanned as far as 92’-8”.
Central Utility Plant (CUP) Building, Tampa, FL
Metropolitan Utilities District Pump Station, Omaha, NE
University of Kansas Medical Center Parking Facility #3, Lawrence, KS |